ANALYSIS
OF RATES OF VARIOUS |
|
| EXCAVATION | |
| 1 | EXCAVATION IN ORDINARY SOIL |
| 2 | EXCAVATION IN MURUM |
| 3 | EXCAVATION IN SOFT ROCK |
| 4 | EXCAVATION IN HARD ROCK |
| 5 | RUBBLE SOLING |
| PLAIN & REINFORCED CONCRETE | |
| 6 | CONCRETE GRADES M5, M7.5, M10 & M15 ( Large Project + Batching Plant ) |
| 7 | CONCRETE GRADES M20, M25, M30 & M35 ( Large Project + Batching Plant ) |
| 8 | CONCRETE GRADE M5 ( General ) |
| 9 | CONCRETE GRADE M7.5 ( General ) |
| 10 | CONCRETE GRADE M10 ( General ) |
| 11 | CONCRETE GRADE M15 IN FOUNDATION ( General ) |
| 12 | CONCRETE GRADE M15 IN SUPER STRUCTURE BEAMS ( General ) |
| 13 | CONCRETE GRADE M15 IN SUPER STRUCTURE SLABS ( General ) |
| 14 | CONCRETE GRADE M15 IN SUPER STRUCTURE COLUMNS ( General ) |
| 15 | CONCRETE GRADE M15 IN STAIRCASE ( General ) |
| 16 | CONCRETE GRADE M15 IN PARDI / PARAPET / WALL ( General ) |
| 17 | CONCRETE GRADE M20 IN FOUNDATION ( General ) |
| 18 | CONCRETE GRADE M20 IN SUPER STRUCTURE BEAMS ( General ) |
| 19 | CONCRETE GRADE M20 IN SUPER STRUCTURE SLABS ( General ) |
| 20 | CONCRETE GRADE M20 IN SUPER STRUCTURE COLUMNS ( General ) |
| 21 | CONCRETE GRADE M25 IN FOUNDATION ( General ) |
| 22 | CONCRETE GRADE M25 IN SUPER STRUCTURE BEAMS ( General ) |
| 23 | CONCRETE GRADE M25 IN SUPER STRUCTURE SLABS ( General ) |
| 24 | CONCRETE GRADE M25 IN SUPER STRUCTURE COLUMNS ( General ) |
| REINFORCEMENTS | |
| 25 | REINFORCEMENTS |
| MASONRY WORKS | |
| 26 | 350 THICK RUBBLE MASONRY |
| 27 | 230 THICK BRICK MASONRY |
| 28 | 150 ( 6 " ) THICK BRICK MASONRY |
| 29 | 115 ( 4 " ) THICK BRICK MASONRY |
| 30 | 200 THICK HOLLOW BLOCK MASONRY |
| 31 | 100 THICK HOLLOW BLOCK MASONRY |
| PLASTER | |
| 32 | 10 THICK NEERU PLASTER |
| 33 | 15 THICK NEERU PLASTER |
| 34 | 15 THICK PLAIN PLASTER WITH WATER PROOFING COMPOUND |
| 35 | RATE ANALYSIS FOR 20 mm THICK PLAIN PLASTER WITH WATER PROOFING COMPOUND IN 2 COATS |
| MORTARS | |
| 36 | RATE ANALYSIS FOR CEMENT MORTAR CM 1:2 |
| 37 | RATE ANALYSIS FOR CEMENT MORTAR CM 1:3 |
| 38 | RATE ANALYSIS FOR CEMENT MORTAR CM 1:4 |
| 39 | RATE ANALYSIS FOR CEMENT MORTAR CM 1:5 |
| 40 | RATE ANALYSIS FOR CEMENT MORTAR CM 1:6 |
| 41 | RATE ANALYSIS FOR LIME MORTAR LM 1:2 |
| 42 | RATE ANALYSIS FOR LIME MORTAR LM 1:3 |
| 43 | RATE ANALYSIS FOR LIME MORTAR LM 1:4 |
| 44 | RATE ANALYSIS FOR LIME MORTAR LM 1:5 |
| 45 | RATE ANALYSIS FOR LIME MORTAR LM 1:6 |
| FLOORING | |
| 46 | RATE ANALYSIS FOR 50 mm THICK IPS |
| 47 | RATE ANALYSIS FOR MOSAIC FLOORING |
| 48 | RATE ANALYSIS FOR MOSAIC TILE SKIRTING |
| 49 | RATE ANALYSIS FOR KOTAH STONE FLOORING |
| 50 | RATE ANALYSIS FOR KOTAH STONE RISERS & TREADS |
| 51 | RATE ANALYSIS FOR KOTAH STONE SKIRTING |
| 52 | RATE ANALYSIS FOR GLAZED / CERAMIC TILE FLOORING |
| 53 | RATE ANALYSIS FOR GLAZED DADO |
| 54 | RATE ANALYSIS FOR MARBLE FLOORING |
| WATER PROOFING | |
| 55 | RATE ANALYSIS FOR GLAZED CHINA MOSAIC W/P FOR TERRACE |
| 56 | RATE ANALYSIS FOR BRICK BAT W/P FOR TERRACE |
| 57 | RATE ANALYSIS FOR BRICK BAT W/P FOR TOILET |
|
Note: 1. Material cost should include all taxes, such as sales, octroi, excise etc. 2. We have added 5 % as wastage wherever applicable. 3. Rates should include equipments, machineries, temporary approaches, water, fuel & electrical consumptions, contingencies & sundries. 4. Over head should include office expenses, supervision, administration, accounting, insurance, safety / security & storage costs. |
|